- Contract Amount
- $384,000.00
- Project Type
- Lighting
- Project Owner
- CEC International
- General Contractor
- PSE & G
- Electrical Contractor
- FSG
CEC International Trenton, New Jersey
Project
FSG helped CEC International cut energy costs by over $92,000 annually through a comprehensive lighting and HVAC retrofit at a 900-person correctional facility.
Challenge
CEC International partnered with FSG to implement energy-saving upgrades at the Bo Robinson correctional facility in Trenton, New Jersey. With over 900 occupants, the facility required thoughtful design and careful execution to ensure both operational efficiency and long-term savings. FSG was selected for our proven experience in lighting retrofits, energy audits, and integrated system improvements.Solution
FSG began by conducting a detailed energy audit, which formed the foundation for a tailored retrofit plan. The solution included the replacement of more than 1,070 interior and exterior fixtures with high-efficiency T8 electronic lighting and advanced induction lighting. These lighting upgrades were designed not only to reduce consumption but also to enhance visibility and safety across the facility.Result
In addition to lighting, the project included the replacement of over 107 tons of HVAC equipment and the integration of new refrigeration controls. The combined upgrades resulted in annual energy savings of more than $92,000, delivering measurable impact to the facility’s bottom line while improving comfort and performance for its staff and residents.FSG projects consistently deliver excellence for our customers, for our employees, and for the communities we serve.
We see each project as an opportunity to embrace our mission and provide superior value through quality products, service, and support.
Let's Talk
Fill out the form and we’ll schedule a call to talk through a custom solution for you.
Or call us at
888-215-1336